Geotechnical investigation and evaluation of the feasibility for a potential alternative route for the N3 near Van Reenen. Route includes very deep excavations, tunnels (drill-and-blast and cut-and-cover) and several large bridges and viaducts.
Client
SANRAL HO
Tasks
Geological mapping, geotechnical investigation, preliminary/feasibility design including slope stability and tunnel analysis