circle bg

Geotechnical investigation for widening of 25km of the N3 from Paradise Valley to Key Ridge. Including detailed geotechnical design for 10km of widening at Mariannhill Valley (from 3 lanes to 5 lanes each direction)

Client

SANRAL / SMEC

Consultants

BVi, SMEC, V3

Tasks

Drilling contract management, geotechnical investigation, foundation design, pile foundations, slope stability, MSE walls design, tender doc.

Share this:

Contact Us

Full Name(Required)

Share this:

Our Clients