Geotechnical investigation for widening of 25km of the N3 from Paradise Valley to Key Ridge. Including detailed geotechnical design for 10km of widening at Mariannhill Valley (from 3 lanes to 5 lanes each direction)
Client
SANRAL / SMEC
Consultants
BVi, SMEC, V3
Tasks
Drilling contract management, geotechnical investigation, foundation design, pile foundations, slope stability, MSE walls design, tender doc.