Client
Scott + Partners
Location
Camps Bay, Cape Town
Project Description
The Barbara Road project was situated upon complex topography that required lateral support during construction and piling as part of the foundation for the residential property. Due to the site’s unique terrain and slope stability challenges, the team was tasked with developing a solution that could provide adequate support and stability for the structure. The design incorporated a lateral support system and piled foundations, which were specifically tailored to the site’s unique requirements. The project also involved extensive geotechnical analysis to ensure that the design was optimized for the site’s conditions.
Project Tasks
- Pile foundation design and analysis
- Soldier pile design
- Global stability
Project Results
The successful completion of the project required careful coordination and communication between all parties involved, as well as the use of specialized equipment and techniques to overcome the complex topographical challenges.